Adinda Izora - Bow Thruster problem


Feed back pitch problem, checked conection at potentiometer, loose conection.

Scana volda - CPP Propulsion System

Vessel name : Adinda Izora
IMO no        : 9340740




MPS140 suspect problem, command from ECR can't transfer to W/H.
Problem done well, replaced MPS 140, sett and calibrated of card (26Jan2015, mv izora, jakarta)

Jumat, 10 Januari 2014

BNWAS Installation

LE GUARDIAN 2025

Installation finished

Vessel Name : AHTS DP1 ERA BERDIKARI and UV.Jeny





Wind Tracker Calibration

Brand : Young USA
Model : 06206

Dear All
After the device installation was finished, make of the wind sensor to fix position, for example north positon, and move of the lower sensor device to the rigth or left to north position also, with guidence from indicator position at bridge room.












Line Boring tool set

Assalamualaikum Alhamdulilah bisa melonggarkan nulis lagi. Kegiatan hari ini memperbaiki tool set line boring, alhamdulilah selesai. Tes ok....