LE GUARDIAN 2025
Installation finished
Vessel Name : AHTS DP1 ERA BERDIKARI and UV.Jeny
Jumat, 10 Januari 2014
Wind Tracker Calibration
Brand : Young USA
Model : 06206
Dear All
After the device installation was finished, make of the wind sensor to fix position, for example north positon, and move of the lower sensor device to the rigth or left to north position also, with guidence from indicator position at bridge room.
Model : 06206
Dear All
After the device installation was finished, make of the wind sensor to fix position, for example north positon, and move of the lower sensor device to the rigth or left to north position also, with guidence from indicator position at bridge room.
Langganan:
Postingan (Atom)
-
Assalamualaikum Alhamdulilah bisa melonggarkan nulis lagi. Kegiatan hari ini memperbaiki tool set line boring, alhamdulilah selesai. Tes ok....
-
Assalamualaikum Sedulur semuanya, hari ini saya akan membahas perbaikan flow meter emerson 1700 yang ditemukan displaynya mati total. Dilaku...
